Home
World Journal of Advanced Engineering Technology and Sciences
International, Peer reviewed, Referred, Open access | ISSN Approved Journal

Main navigation

  • Home
    • Journal Information
    • Abstracting and Indexing
    • Editorial Board Members
    • Reviewer Panel
    • Journal Policies
    • WJAETS CrossMark Policy
    • Publication Ethics
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Become a Reviewer panel member
    • Join as Editorial Board Member
  • Contact us
  • Downloads

ISSN: 2582-8266 (Online)  || UGC Compliant Journal || Google Indexed || Impact Factor: 9.48 || Crossref DOI

Fast Publication within 2 days || Low Article Processing charges || Peer reviewed and Referred Journal

Research and review articles are invited for publication in Volume 18, Issue 2 (February 2026).... Submit articles

Managing construction and demolition waste in Bangladesh: Obstacles and enduring remedies

Breadcrumb

  • Home
  • Managing construction and demolition waste in Bangladesh: Obstacles and enduring remedies

Asif Hossain Abir * and Mehedi Hasan Bappy

Department of Local Government Engineering, Dhaka, Bangladesh.

Review Article
 
World Journal of Advanced Engineering Technology and Sciences, 2024, 12(02), 699–709.
Article DOI: 10.30574/wjaets.2024.12.2.0336
DOI url: https://doi.org/10.30574/wjaets.2024.12.2.0336

Received on 26 June 2024; revised on 08 August 2024; accepted on 10 August 2024

Bangladesh has experienced a remarkable surge in urbanization and growth over the past few decades. The metropolis of Dhaka is home to 30% of the nation's urban population. The construction industry in and around Dhaka has accelerated in response to the growing need for housing facilities to meet the demands of shelter for this large influx of people. This increased building has many negative effects on the environment and society, including waste generation. A nation's balanced development depends on its use of competitive, environmentally friendly, and sustainable building practices. As a result, proper handling of construction wastes is becoming a crucial concern. Wastes from construction and demolition make up a sizable portion of the waste stream that is dumped in the city's landfills. The majority of the time, construction waste management practices are appalling. It is time to consider taking some prompt action to put various management strategies into practice. Reviews of construction wastes, their production, and current management techniques were taken into consideration in this study. Lastly, suggestions from Bangladesh's perspective is given.

Construction and Demolition Waste; Reduce; Reuse; Environmental Issues; Existing Laws; Waste Management.

https://wjaets.com/sites/default/files/fulltext_pdf/WJAETS-2024-0336.pdf

Get Your e Certificate of Publication using below link

Download Certificate

Preview Article PDF

Asif Hossain Abir and Mehedi Hasan Bappy. Managing construction and demolition waste in Bangladesh: Obstacles and enduring remedies. World Journal of Advanced Engineering Technology and Sciences, 2024, 12(02), 699–709. Article DOI: https://doi.org/10.30574/wjaets.2024.12.2.0336

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content


Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


Copyright © 2026 World Journal of Advanced Engineering Technology and Sciences

Developed & Designed by VS Infosolution