Home
World Journal of Advanced Engineering Technology and Sciences
International, Peer reviewed, Referred, Open access | ISSN Approved Journal

Main navigation

  • Home
    • Journal Information
    • Abstracting and Indexing
    • Editorial Board Members
    • Reviewer Panel
    • Journal Policies
    • WJAETS CrossMark Policy
    • Publication Ethics
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Become a Reviewer panel member
    • Join as Editorial Board Member
  • Contact us
  • Downloads

ISSN: 2582-8266 (Online)  || UGC Compliant Journal || Google Indexed || Impact Factor: 9.48 || Crossref DOI

Fast Publication within 2 days || Low Article Processing charges || Peer reviewed and Referred Journal

Research and review articles are invited for publication in Volume 21, Issue 2 (November 2026).... Submit articles

Prediction of rainfall and ore productions (ore and wastes) using multivariate time-series approach, Enyigba open pit mine Ebonyi state, Nigeria

Breadcrumb

  • Home
  • Prediction of rainfall and ore productions (ore and wastes) using multivariate time-series approach, Enyigba open pit mine Ebonyi state, Nigeria

AFU Damilola Johnson 1, *, OGUNYEMI Olaoluwa Bidemi 1, EKUN Adekunle 2 and AGBADUA Segun Afokhainu 3

1 Department of Mining Engineering, Federal University of Technology Akure, Ondo State, Nigeria.
2 Zhong Sing Mining Investment, Auchi, Edo State, Nigeria
3 Research and Development Department, National Engineering Design Development Institute Nnewi, 

Research Article

World Journal of Advanced Engineering Technology and Sciences, 2026, 20(01), 061–087

Article DOI: 10.30574/wjaets.2026.20.1.0342

DOI url:https://doi.org/10.30574/wjaets.2026.20.1.0342

Received on 22 May 2026; revised on 27 June 2026; accepted on 29 June 2026

This article aimed at predicting rainfall and ore production of Eyigba open pit Mine Ebonyi State using a Multivariate Time-Series Approach. Rainfall and ore (ore, waste) production data collections, review of machine learning (ML) techniques for  rainfall and ore prediction and integrating of various techniques are few objectives of this article. The datasets are trained, fit into models, propose a model combining Seasonal and Trend Decomposition (STL), Synthetic Minority Over-Sampling Techniques (SMOTE), Random Forest (RF) and Long Term Short Memory (LSTM) in order to optimize the proposed architecture combining Seasonal Trend Decompsotion (STL), Synthetic Minority Over-sampling Technique (SMOTE), Random Forest (RF), and Long Term Short Memory (LSTM), formulate mathematical models for algorithm integration, evaluate performance of the models and their implications for mining operations. The pipeline integrates STL for preprocessing, SMOTE for data augmentation, RF for feature engineering, and LSTM networks for prediction. STL decomposes time series to mitigate seasonality, SMOTE augments underrepresented low-production events, RF selects optimal lags, and LSTM captures temporal dependencies. Performance evaluation of the multivariate model achieves an RMSE of 1,850 tons and MAPE of 8.2% for ore production, surpassing standalone RF(RMSE: 2,450 tons, MAPE: 11.5%) and univariate LSTM (RMSE: 2,120 tons, MAPE: 9.8%). These results demonstrate the framework’s ability to model rainfall-ore interactions, enabling proactive operational strategies. The performance of the models compared and concluded that the integrated LSTM outperformed other models. The findings confirmed that rainfall significantly influences ore production rates due to its impact on equipment efficiency, pit floor stability, and haulage operations. 

Artificial Intelligence; Time-Series; Prediction; LSTM; SMOTE Augmentation; Rainfall; Ore

https://wjaets.com/sites/default/files/fulltext_pdf/WJAETS-2026-0342.pdf

Get Your e Certificate of Publication using below link

Download Certificate

Preview Article PDF

AFU Damilola Johnson, OGUNYEMI Olaoluwa Bidemi, EKUN Adekunle and AGBADUA Segun Afokhainu.Prediction of rainfall and ore productions (ore and wastes) using multivariate time-series approach, Enyigba open pit mine Ebonyi state, Nigeria. World Journal of Advanced Engineering Technology and Sciences, 2026, 20(01), 061–087. Article DOI: https://doi.org/10.30574/wjaets.2026.20.1.0342

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content


Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


Copyright © 2026 World Journal of Advanced Engineering Technology and Sciences

Developed & Designed by VS Infosolution