Home
World Journal of Advanced Engineering Technology and Sciences
International, Peer reviewed, Referred, Open access | ISSN Approved Journal

Main navigation

  • Home
    • Journal Information
    • Abstracting and Indexing
    • Editorial Board Members
    • Reviewer Panel
    • Journal Policies
    • WJAETS CrossMark Policy
    • Publication Ethics
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Become a Reviewer panel member
    • Join as Editorial Board Member
  • Contact us
  • Downloads

ISSN: 2582-8266 (Online)  || UGC Compliant Journal || Google Indexed || Impact Factor: 9.48 || Crossref DOI

Fast Publication within 2 days || Low Article Processing charges || Peer reviewed and Referred Journal

Research and review articles are invited for publication in Volume 18, Issue 2 (February 2026).... Submit articles

Combination of genetic algorithm and shifting bottleneck heuristics to solve a job shop scheduling problem in wood processing company

Breadcrumb

  • Home
  • Combination of genetic algorithm and shifting bottleneck heuristics to solve a job shop scheduling problem in wood processing company

Diem-Thuy Vien-Nguyen 1, 2, Phi-Hung Tran 1, 2, Quynh-Lam Ngoc-Le 1, 2, 3 and Ngoc-Hien Do 1, 2, *

1 Department of Industrial & Systems Engineering, Faculty of Mechanical Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, District 10, Ho Chi Minh City, Vietnam.
2 Vietnam National University Ho Chi Minh City, Linh Trung Ward, Thu Duc City, Ho Chi Minh City, Vietnam.
3 VNU Center for Education Accreditation, Vietnam National University Ho Chi Minh City, Linh Trung Ward, Thu Duc City, Ho Chi Minh City, Vietnam.

Research Article
 
World Journal of Advanced Engineering Technology and Sciences, 2024, 11(01), 037–047.
Article DOI: 10.30574/wjaets.2024.11.1.0017
DOI url: https://doi.org/10.30574/wjaets.2024.11.1.0017

Received on 02 December 2023; revised on 17 January 2024; accepted on 20 January 2024

The scheduling problem has always been the concern of most companies in the flexible Job shop or Job shop environments because of its complexity. It is really a challenge for researchers to solve or find out the optimum solution. The lead time production at Teak Woods line in a wood processing company, a case study, faced with about 80% of orders which could not be done on time, although its capacity meet requirements. Therefore, it is very useful and necessary to set up a production scheduling model in order to reduce production time and synchronize the product’s parts through efficient modulation in an optimum sequence of jobs on the shopfloor. A combination of Genetic Algorithm and Shifting Bottleneck Heuristics was used to find out high quality solutions. It shows that the productivity increased from 2.32 m3/day to 4.3 m3/day (up 98.27%); Processing time was reduced from 3248.6 minutes to 1352.1 minutes (down 58.38%); The sync time decreased from 7554.8 minutes to 350.8 minutes (down 95.36%).

Genetic Algorithm; Shifting Bottleneck Heuristics; Combination of Genetic Algorithm and Shifting Bottleneck Heuristics; Job shop Scheduling Problem; Wood Processing Company

https://wjaets.com/sites/default/files/fulltext_pdf/WJAETS-2024-0017.pdf

Get Your e Certificate of Publication using below link

Download Certificate

Preview Article PDF

Diem-Thuy Vien-Nguyen, Phi-Hung Tran, Quynh-Lam Ngoc-Le and Ngoc-Hien Do. Combination of genetic algorithm and shifting bottleneck heuristics to solve a job shop scheduling problem in wood processing company. World Journal of Advanced Engineering Technology and Sciences, 2024, 11(01), 037–047. Article DOI: https://doi.org/10.30574/wjaets.2024.11.1.0017

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content


Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


Copyright © 2026 World Journal of Advanced Engineering Technology and Sciences

Developed & Designed by VS Infosolution