Home
World Journal of Advanced Engineering Technology and Sciences
International, Peer reviewed, Referred, Open access | ISSN Approved Journal

Main navigation

  • Home
    • Journal Information
    • Abstracting and Indexing
    • Editorial Board Members
    • Reviewer Panel
    • Journal Policies
    • WJAETS CrossMark Policy
    • Publication Ethics
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Become a Reviewer panel member
    • Join as Editorial Board Member
  • Contact us
  • Downloads

ISSN: 2582-8266 (Online)  || UGC Compliant Journal || Google Indexed || Impact Factor: 9.48 || Crossref DOI

Fast Publication within 2 days || Low Article Processing charges || Peer reviewed and Referred Journal

Research and review articles are invited for publication in Volume 18, Issue 2 (February 2026).... Submit articles

The role of advanced earned value management (EVM) metrics in schedule performance analysis of building projects

Breadcrumb

  • Home
  • The role of advanced earned value management (EVM) metrics in schedule performance analysis of building projects

Pratik Bhikhubhai Panchal *

Senior Scheduler Project Controls Specialist Stantec Canada.

Research Article
 
World Journal of Advanced Engineering Technology and Sciences, 2023, 09(02), 391-405.
Article DOI: 10.30574/wjaets.2023.9.2.0194
DOI url: https://doi.org/10.30574/wjaets.2023.9.2.0194

Received on 26 May 2023; revised on 15 July 2023; accepted on 18 July 2023

Although venerable by the tide, the tools and metrics used still include CPI, SPI, and performance in the form of schedules; these hardly reflect true scheduling performance, especially in more complex scenarios of building projects subject to multiple variables. Thus, the advanced metrics of EVM introduced for measuring the Earned Schedule (ES), Schedule Variance (SV), and To-Complete Performance Index (TCPI) allow not only the argument of schedules on more rigorous grounds but also for extensive commentary with an eye both to history and future in respect of schedule performance. This research follows a mixed-method approach comprising quantitative data analysis and qualitative case studies. Quantitative analysis was applied to data from building projects to compare conventional with advanced metrics. By interviewing project managers, qualitative data were obtained to inform on the applicability and effectiveness of advanced EVM metrics. Advanced EVM metrics have proved to greatly assist in appraising the schedule performance. Advanced metrics such as ES and SV provide a greater depth of understanding concerning the project's progress and thus afford its managers some discretion for making proactive decisions. In other words, TCPI comes in concerning forecasts and, thereby, resource planning, showing even this level of performance that must be achieved to meet the deadlines. These metrics also synchronize cost and schedule management so that immediate detection of issues can occur with a concomitant reduction of the risk of delays and cost overruns, providing a sense of security and optimism. Transparency plus communication, combined with Evm Metrics, significantly affect stakeholders' trust and satisfaction. Training workshops organized for project teams and management tools emerging as organizational tools with these advanced metrics can enhance these benefits. Other options range from investigating possible applications for different project types to possible synergies in integrating AI technologies. 

Earned Value Management; Schedule Performance; Building Projects; Project Management; Advanced Metrics

https://wjaets.com/sites/default/files/fulltext_pdf/WJAETS-2023-0194.pdf

Get Your e Certificate of Publication using below link

Download Certificate

Preview Article PDF

Pratik Bhikhubhai Panchal. The role of advanced earned value management (EVM) metrics in schedule performance analysis of building projects. World Journal of Advanced Engineering Technology and Sciences, 2023, 09(02), 391-405. Article DOI: https://doi.org/10.30574/wjaets.2023.9.2.0194 

 

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content


Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


Copyright © 2026 World Journal of Advanced Engineering Technology and Sciences

Developed & Designed by VS Infosolution