1 Department of Industrial & Systems Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward, Ho Chi Minh City, Vietnam.
2 Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.
World Journal of Advanced Engineering Technology and Sciences, 2025, 17(01), 061–070
Article DOI: 10.30574/wjaets.2025.17.1.1380
Received on 26 August 2025; revised on 04 October 2025; accepted on 06 October 2025
This study would present a combination of dispatching rules in scheduling jobs on two identical parallel production lines to minimize the values of makespan and total weighted tardiness. Although, individual dispatching rule could achieve good results for a specific objective function value, combination of the LPT-SPT or LPT-ATC methods would bring better results for considered objectives. The results of the study indicate that combining the LPT-SPT methods would yields the best outcomes in comparison with individual dispatching rules. It could help enhance the efficiency and effective of limited resources.
Identical Parallel Machines; Dispatching Rules; Longest Processing Time Rule; Shortest Processing Time Rule; Apparent Tardiness Cost Rule; Scheduling Problem
Preview Article PDF
Nguyen Van Hieu, Truong Yen Chi, Cao Thi Anh Dao and Do Ngoc Hien. Combination of dispatching rules to minimize makespan and total weighted tardiness for identical parallel machines scheduling problem: A case study. World Journal of Advanced Engineering Technology and Sciences, 2025, 17(01), 061-070. Article DOI: https://doi.org/10.30574/wjaets.2025.17.1.1380.